以下为句子列表:
英文: Abstract: Construction of returing the gain polts to grass project area of Sangequanzi Shawan County completely change that we do not understand great role of grass land in dry land ecological system and an important position in national economy developme
中文: 文摘:沙湾县三个泉子退耕还草项目区的建设,彻底改变了长期以来由于草地在陆地生态系统中的巨大作用和在国民经济发展中的重要地位未被充分认识,加之受传统的重农轻牧,重牧轻草,轻草贱草等社会思想的影响,彻底改变了草地建设等许多措施没有落到实处,尤其是草地生态建设的步伐远远不能适应生态环境发展要求的现状。
更详细...
英文: Ningxiang County Long Tianfan the industry limited company is located within the boundaries of the beautiful and rich Hunan Province Ningxiang County, the first period project area approximately 28000 square meters, have the fixed asset 2800 ten thousand
中文: 宁乡县龙田钒业有限公司位于美丽富饶的湖南省宁乡县境内,首期工程占地面积约28000平方米,拥有固定资产2800余万元,职工200余人,年生产能力240吨;二期工程竣工后年生产能力达500-600吨。
更详细...
英文: Storm water in the project area is collected via a storm water drainage network and discharged into the Shuzi Lake and Wolong River from north to south.
中文: 这里的从北到南到底是指的卧龙河的流向?还是数字湖和卧龙河在地理上的分布?
更详细...
英文: The SPDRC should apply to the CBRC for Exemption for Eco-fund to lend loan and charge interest in Project area for project life after the implementing TA team has completed the design of Eco-fund.
中文: 陕西省发展和改革委员会应当于实施了由技术援助团队筹划完成的生态基金之后,在项目期内和项目范围内,免除对中国银行业监督委员会的贷款和利息收费。
更详细...
英文: There are 143 resettlement sites in the first and second phase of resettlement in Xiaolangdi project area of which there are 126 villages with serious soil and water loss.
中文: 小浪底工程库区一期、二期移民,安置点共143个,有126个村水土流失严重。
更详细...
|