以下为句子列表:
英文: 1 Formal record in place which indicates relevant process name, machine number, inspector name, time interval, inspected items, judgment, etc.
中文: 正规纪录清楚注明相关工序之名称,机器号码,检查员名字,时段,检验专案,判定等.
更详细...
英文: 1 Material ID label (name, P/N, manufacturer, lot, qty) and IQC passed label (name, P/N, inspector name (chop) and date) well used.
中文: 有效使用:物料ID标签(名称,零件号码,供应商,批数,数量)及IQC检验合格的标签(名称,零件号码,检验员姓名,日期).
更详细...
英文: 1 The Inspector will date and sign the GREENtag when there are no defects in scaffold construction noting total working load on tag.
中文: 当脚手架结构不存在缺陷时,将在“绿色”标牌上签署日期和姓名,并在标牌上记录总工作负荷。
更详细...
英文: 2 The Inspector will date and sign the YELLOWcaution tag and fill in any restrictions or cautions associated with the scaffold noting the total working load on tag.
中文: 检查员将在“黄色”警告性标牌上签署日期和姓名,并填写与脚手架有关的任何限制或警告,并标注脚手架的总工作负荷。
更详细...
英文: 3 The Inspector will date and sign a REDtag indicating that the scaffold is not to be used because it is being modified or is not suitable for people to be working on it.
中文: 检查员将在“红色”标牌上签署日期和姓名,指出该脚手架不得使用,因为它已被修改或不适合人员在其上工作。
更详细...
|