以下为句子列表:
英文: 7 Before operation of the temporary bus depot at the project site, the Permit Holder shall prepare a Contamination Assessment Plan (CAP) in accordance with Section 3 of Annex 19, TM on EIA Process, and the ProPECC PN3/94.
中文: 在工程项目地点营运临时巴士车厂之前,许可证持有人须按照《环境影响评估程序的技术备忘录》附件19第3节及《专业人士环保事务谘询委员会专业守则3/94》拟备一份污染评估计划。
更详细...
英文: Act as the interface between ChangAnFord(CAF) and the Engineering Source(s) on ECC and WERS concern process, to ensure smooth progression and introduction of changes.
中文: 作为长安福特和产品工程源头的联络窗口,在工程更改控制和WERS问题处理过程中确保工程更改的顺利导入和进行。
更详细...
英文: Commands to set data patterns, perform ECC tests, manipulate the error log, dump the sequencer ram.
中文: 用来为测试配置柱面,磁头,给出选项来随机柱面/磁头和随机数据模式的指令。
更详细...
英文: Lee, Shun-Cheng,1990,06, Trade Liberalization and the Development of Poultry Sector in Taiwan, paper presented at the Conference on Negotiations Subgroup of the PECC Task Force on Agricultural Policy, Trade and Development, June 3 - 7, Bangkok, Thailand.
中文: 李顺成,1992,06,练气与新休閒文化,行政院文化建设委员会主办休閒文化新方向,研讨会,大会报告研讨主题,国立政治大学公企中心,民国八十一年六月二十七日至二十八日。
更详细...
英文: Lee, Shun-Cheng,1990,09,Cutflower Production Potentials and Trade in Taiwan, paper presented at the Conference on Measure tom Promote Cutflower Trade in Asia - Pacific Region, the PECC Task Force on Agricultural Policy, Trade and Development, September 3
中文: 李顺成,1995,07,海峡两岸主要农产品贸易竞争力结构之经济分析,1995漳州海峡两岸农业合作与发展研讨会,民国八十四年七月三日至六日。
更详细...
|