以下为句子列表:
英文: 2 The Permit Holder shall deposit with the Director, within 2 months after the operation of the Project, 3 hard copies and 1 soft copy of the monitoring record on the odour levels and any action taken to reduce the odour level as set out in Condition 2.1.
中文: 许可证持有人须于工程项目营办后2个月内,向署长存放气味水平监测纪录及任何如条件第2.1项所述,为减低气味水平而采取的有关行动的3份硬复本及1份软复本。
更详细...
|