|
paralleling
|
|
并联,并列
|
分类:
|
详细解释:
|
|
以下为句子列表:
英文: First Start Sensor A first start sensor is an electronic device within some paralleling equipment that senses generator set and bus voltage and frequency, and determines whether or not a generator set is the first unit ready to close to the bus following
中文: 首启动传感器首启动传感器是应用于某些并联设备中的电子装置,功能是感知发电机组和母排的电压、频率,判断哪个机组在接到“黑启动”信号后第一个可以合到母排。
更详细...
英文: Load Demand is a paralleling system operating mode in which the system monitors the total kW output of the generator sets, and controls the number of operating sets as a function of the total load on the system.
中文: 负载需求是并联系统的一种运行模式,系统监控发电机组总的输出功率,根据系统总负载量决定运行机组的数量。
更详细...
英文: Load Shedding Load shedding is the process by which the total load on a paralleling system is reduced, on overload of the system bus, so that the most critical loads continue to be provided with reliable electrical service.
中文: 卸载在超载的系统母排上,并联系统的总负载被降低的过程称为卸载,以确保最关键负载获得可靠的电力供应。
更详细...
英文: Master Control A control section in a typical paralleling system that provides total system metering and the interface point between the paralleling system and the facility.
中文: 主控制主控制是典型的并联系统计量控制设备,也是并联系统与用电设施之间的接口。
更详细...
英文: Neutral Current Neutral current is the current that flows in the neutral leg of a paralleling system. Often, this term is used in reference to circulating currents or cross currents.
中文: 零线电流零线电流指的是通过并联系统零线的电流,在谈及环流电流或者交叉电流时常会提到这个术语。
更详细...
|
|
|
|