以下为句子列表:
英文: This paper has expounded the key fabrication progress, key inspection and test points for the Pressure Vessels of Shell Gasification Key equipment per the actual fabrication experiences.
中文: 摘要根据煤气化装置中最重要的设备-气化关键设备压力容器的制造实践,综合论述了该设备的主要制造工艺、核对总和试验的要点。
更详细...
英文: 3 months later of the completion, it is surely for the reason of contractor itself, the inspection and test can not be executed, then it can be delayed, but should not overpass 3 months.
中文: 如本工程安装完工后三个月,承包人确因发包人原因无法进行检验调试,则本工程调试期顺延,但最长不超过三个月。
更详细...
|