以下为句子列表:
英文: In accordance with the results of stability analysis of the slope in Zijinshan Open-cut Gold Mine, it is found that the stability of originally designed slope can I meet the engineering requirements.
中文: 摘要紫金山金矿露天边坡稳定性计算分析结果表明,原设计边坡的稳定性不能满足工程要求。
更详细...
英文: Vegetation Restoration in Zungeer Open-cut Coal Mine —— Natural Recovery in Soil Refusal Site.
中文: 准格尔煤田露天矿植被恢复的研究——排土场植被自然恢复的观察研究
更详细...
|