以下为句子列表:
英文: Auto power cut-off when standby for 30 minutes or temperature test system failure. It achieves energy save, safety and prolongs life of heater.
中文: 当30分钟闲置,或测温系统出现故障,如焊咀温度低于警诫线,发热芯或线路板发生故障时,自动切断电源,具安全,省电及延长芯头寿命的优势。
更详细...
英文: Based on the analysis of the temperature test result of the landing rectangle aqueduct of Caohe River for the emergency water supply project of the Beijing-Shijiazhuang Section on the Middle Route of the South-to-North Water Diversion Project, the tempera
中文: 摘要通过对南水北调中线京石段应急供水工程漕河渡槽段落地矩形渡槽温度测试结果的分析,阐述了薄壁混凝土早期水化热温度发展的特点,提出了影响落地矩形渡槽水化热温度的主要因素与控制措施。
更详细...
英文: The paper introduces the application of following new technologies in Letan hydropower station construction and their effects: distributed optical fiber temperature test technology, cement paste grouting watertight technology, horizontal presplit blasting
中文: 摘要介绍分布式光纤温度监测技术、水泥膏浆堵漏防渗技术和建基面水平预裂爆破技术在乐滩水电站工程施工的应用及其效果。
更详细...
|