以下为句子列表:
英文: In a numerical study the influence of various model parameters is investigated and it is shown that the production rate, unit holding cost, and investment cost for postponement can obviously affect to the solution of the revised flow line.
中文: 本研究建构产品线的延迟点规划數学决策模式,寻找最低总成本的解,并且以实际範例說明求解的步骤,以及各项系统參數对延迟点规划决策的影响,执行结果显示生产率、单位存货成本、及投资设置成本三者非常影响产品线延迟点规划的决策。
更详细...
|