以下为句子列表:
英文: 2 Cost Estimating—developing an approximation (estimate) of the costs of the resources needed to complete project activities.
中文: 费用估算-编制完成项目工序所必须的资源费用的估计。
更详细...
英文: A (2+ε)-approximation algorithm is presented, where ε>0 can be made arbitrarily small.
中文: 给出了一个(2+ε)-近似算法,ε>0可以任意小。
更详细...
英文: A convergence estimate and approximation for a kind of parabolic variational inequality is discussed.
中文: 摘要本文讨论了一类抛物型变分不等式的近似收敛问题。
更详细...
英文: A non-driving-force approximation is presented for the description of dynamic response of a spherical porous particle subject to a step change in the surface concentration.
中文: 摘要本研究推导用于描述因颗粒表面浓度阶梯式改变所导致动态行为之非驱动力近似式。
更详细...
英文: A successive approximation algorithm of designing optimal disturbances rejection controllers is developed with respect to quadratic performance indexes.
中文: 关于二次型性能指标给出了一种设计最优扰动抑制控制律的逐次逼近方法。
更详细...
|