|
After installation, a Field Test shall be performed by the installer on each completed Dry-Pit Submersible Pump System. |
中文意思: 安装后,安装商应该对每台完整的干井潜水泵系统进行现场测试。 |
以下为相关句子列表(点击查看,可以看对应的解释):
|
|
After ink filters, user shall adjust “position determination ”button to place it in the best sealing position.
|
|
|
待印油自然渗布均匀后,调节定位旋钮,定格在最佳盖印位置。 |
|
After inspection and acceptance by the warehouser, if any non-compliance in respect of the type, quantity or quality of the goods occurs, the warehouser shall be liable for damages.
|
|
|
保管人验收后,发生仓储物的品种、数量、质量不符合约定的,保管人应当承担损害赔偿责任。 |
|
After installation of valve, access to water with the normal pressure, the drainage outlet should have no water leakage.
|
|
|
5阀门安装好后,通入正常压力的水,排污口应无水流出。 |
|
After installation of valve, support line; a sagging pipe line can distort valve and cause failure.
|
|
|
安装阀门后,要支撑住管道:下垂的管道会使阀门产生变形而导致失败。 |
|
After installation of valve, support the pipe line; a sagging pipe line can distort the valve and cause failure.
|
|
|
在安装阀门后,要对管道加上支撑物,否则下垂的管道可能会使得阀门变形并造成故障。 |
|
After installation, a Field Test shall be performed by the installer on each completed Dry-Pit Submersible Pump System.
|
|
|
安装后,安装商应该对每台完整的干井潜水泵系统进行现场测试。 |
|
After installation, dispose of packaging material in the proper manner.
|
|
|
安装后,以适当方式处置包装材料。 |
|
After installation, the position of galvanization coating destroyed due to welding,cutting and scratch etc.shall be carried out anti-corrosive coating by install on site.
|
|
|
对安装后的焊接部位,裁切口,碰损擦伤等锌层遭到损伤的部位,要求现场施工人员进行防腐涂装。 |
|
After installing, go into Options --> Security --> Application Permissions.
|
|
|
安装后,选择进入--安--申请许可. |
|
After instructions are given on how to communicate with our camels, we're off into a rough land of red dirt and low, scrubby grass.
|
|
|
我们听完了如何与骆驼沟通的指导后,就出发前往布满红土与低矮草丛的荒野大地。 |
|
After intense work in the summer, we are slack off now.
|
|
|
夏季紧张的工作过後,我们现在放松了。 |
|
|
|