|
Move the high side hose to test cock #4, low side to test cock #3 and open both test cock #3 and test cock #4. Remove vent hose from test cock #1, open shutoff #1.
|
|
|
将高端软管移到测试旋塞4号,低端软管移到测试旋塞3号,并开启测试旋塞3号和测试旋塞4号。从测试旋塞1号上拆卸排气软管,开启关闭阀1号。 |
|
Move the high side hose to test cock No. 4, low side hose to test cock No. 3 and open both test cock No. 3 and 4.
|
|
|
将高端软管移到测试旋塞4号上,低端软管移到测试旋塞3号上,然后开启测试旋塞3号和4号。 |
|
Move the king away to a square where he is not in check.
|
|
|
将国王从被将军的方块移动到另一个方块。 |
|
Move the length positioning(4),the machining aluminium materals can be confirmed then.
|
|
|
移动长度定位器(4),可确定加工件长度. |
|
Move the main switch from on to off or press the control button.
|
|
|
将主开关从开转到关,或者按压控制钮。 |
|
Move the map layer below the feathered white eye lid layer.
|
|
|
将地图图层拖到眼球图层的下面。 |
|
Move the mouse cursor across the blue bars to change focus.
|
|
|
在蓝条上移动鼠标以改变焦点。 |
|
Move the pointer over the vertical bar to the right of the Folder List.
|
|
|
把指针移过条形杆,移至文件夹清单之右。 |
|
Move the reversing handle to ahead side and to the astern side alternately. The single-acting cylinder (17) is actuated corresponding to the operation.
|
|
|
移动换向手柄到正车侧和倒车侧交变地。单作用气缸17被促动相应到操作。 |
|
Move the reversing handle to the ahead side and to the astern side alternately. There is proper blowing from the line filter (51-2) corresponding to the operation.
|
|
|
移动换向手柄到正车侧和倒车侧交变地。有适当的气从滤器51-2吹出相应对操作。 |
|
Move the slide door to the stack position.
|
|
|
移滑动门到存放位置。 |