|
Install valve in the direction of the flow arrows on the valve body.
|
|
|
按照阀体上的箭头方向安装阀门。 |
|
Install valve in the line with arrow on valve body pointing in the direction of flow.
|
|
|
在管线上安装阀门,使其阀体上的箭头指向流体流向。 |
|
Install valve in the line with arrow on valve body pointing in the direction of flow. They should always be installed in an accessible location to facilitate testing and servicing.
|
|
|
在管路上安装阀门,使阀体上的箭头指向流体方向。这些阀门应该安装容易接近的地方,便于检测和维修。 |
|
Install,repair and adjust customer machines to insure machines operating efficiently and reliably. Insure customers are satisfied.
|
|
|
为客户安装、维修和调试纺织后整理设备,保证客户的机器设备有效和可靠运行,保证客户满意。 |
|
Install,repair 、adjust customer machines to insure machines operating efficiently 、reliably. Insure customers are satisfied.
|
|
|
为客户安装、维修和调试纺织后整理设备,保证客户的机器设备有效和可靠运行,保证客户满意。 |
|
Installation Kits/Accessories include the necessary components to perform straight or tee splices, power connection boxes and water-resistant end seal terminations for final installation.
|
|
|
安装附件:安装附件/配件包括伴热线安装时所用电源接线盒;两通、三通及防水的尾端接线盒。 |
|
Installation Template furnished with Flushometer.
|
|
|
随同冲水阀,附带安装模板。 |
|
Installation and alignment inspection of windlass.
|
|
|
锚机安装与校中检查。 |
|
Installation and renovation costs for its temporary installation at Hopkins were also paid for by Toshiba.
|
|
|
霍普斯金的临时安装和更新费用也由东芝公司承担。 |
|
Installation and use of Quanpin Input Method, Microsoft Pinyin Input Method and NJStar Chinese Input Method.
|
|
|
介绍全拼、微软拼音及南极星字词拼音等中文输入法的和使用方法。 |
|
Installation dollars saved with lightweight butterfly valves as compared to heavyweight cast iron valves; i.e. a 10butterfly may weigh 55 pounds, whereas a 10iron gate may weigh 490 pounds.
|
|
|
轻型蝶阀的安装费用比重型铸铁阀门节省的多:例如,一个公称通径10英寸的蝶阀重55磅,而一个10英寸的铸铁闸阀重量就高达490磅。 |