|
Pilgrim at Tinker Creek evidently embodies the followin g postmodernist concepts: firstly, it decomposes the core of modern subjectivity; |
中文意思: 《汀克溪的朝圣者》体现出了明显的后现代主义倾向:它在消解现代主体(性)的核心内容; |
以下为相关句子列表(点击查看,可以看对应的解释):
|
|
Physiochemical identification of Flos Althaea roseae
|
|
|
不同颜色蜀葵花理化分析研究 |
|
Physiology and Pathology of Striae in Jin Gui and Its Function in Micro-Dialectical Pattern Identification
|
|
|
《金匮要略》腠理生理病理及微观辨证 |
|
Phytogeography of Zelkova (Ulmaceae)
|
|
|
榆科榉属的植物地理学 |
|
Pile foundation is used widely,but the calculation is troubled. Traditional calculation only considered single soil layer,it has to adopt equated foundation quotiety for multi soil layer foundation.
|
|
|
桩基础应用广泛 ,但计算麻烦 ,传统的计算方法只能考虑单一的土层 ,对于多层土的地基要采用换算的地基系数。 |
|
Pilgrim at Tinker Creek and Postmodernism
|
|
|
《汀克溪的朝圣者》与后现代主义 |
|
Pilgrim at Tinker Creek evidently embodies the followin g postmodernist concepts: firstly, it decomposes the core of modern subjectivity;
|
|
|
《汀克溪的朝圣者》体现出了明显的后现代主义倾向:它在消解现代主体(性)的核心内容; |
|
Pilgrim at Tinker Creek: The Apotheosis of American Contemporary Ecological Prose
|
|
|
《汀克溪的朝圣者》押美国当代生态散文的典范 |
|
Piling Work in Karachi Port.Pakistan
|
|
|
巴基斯坦卡拉奇港桩工记事 |
|
Pipe sticking occurred at 79. m while tripping out after drilled to 807. 8 m on 0, May, the same year. It was freed through strong jarring and pulling up.
|
|
|
同年月 0日钻至807.8m,起钻到 79. m卡钻,经强力震击和上提090kNK卡。 |
|
Pipe-Jacking Technology with Slight Settlement of Reinforced Concrete Grooved-and-Tongued Pipe
|
|
|
控制地面沉降的钢筋混凝土企口管顶管施工技术 |
|
Piper nigrum L 0.00 , 0.007,0.000,0.00ug/g;
|
|
|
胡椒中相应农残含量分别为0.00 、0.007、0.000及0.00μg/g; |
|
|
|