|
Reviews account analysis on all company-wide accounts to ensure proper documentation for audit purposes.
|
|
|
根据审计标准对公司内部所有的帐务及所附文件进行审核。 |
|
Reviews and analyses have been done aiming at the three main branches of intelligent control of fuzzy logic control, neural neuwork control and expert control system.
|
|
|
对智能控制的3大主要分支模糊逻辑控制、神经网络控制及专家控制系统在污水生物处理中应用的最新动态进行了评论和分析。 |
|
Reviews are made on the development of nickel plating technology for 70 years in Guangdong. Suggestions are mentioned on the nickel electroplating in the future.
|
|
|
摘要通过对广东地区镀镍工艺近70年发展的回顾,提出了今后镀镍发展的一些建议。 |
|
Reviews building load-estimating procedures to ensure that proper loads are used to size the ground-source subsystems.
|
|
|
还有评估建筑物冷/热载,从而选用恰当的地源热泵子系统。 |
|
Reviews equipment plans, specifications and calculations for conformance with the PED 97/23/EC.
|
|
|
确认压力设备的制造计划,技术规范和计算书。 |
|
Reviews on the trophic modes and factors affecting photosynthesis of Spirulina was made.
|
|
|
摘要本文就螺旋藻的营养方式及光合作用的影响因素作了较为全面的综述。 |
|
Reviews the removal methods of formaldehyde, including physical adsorption method, chemical method and biological method. Points out the future study direction.
|
|
|
摘要介绍了物理吸附法、化学法和生物法等去除甲醛的方法的研究概况,指出了今后的室内研究方向。 |
|
Revise and update operating files for energy equipments.
|
|
|
能源设备作业文件的编制、维护。 |
|
Revise individual targets upwards if there is signi? cant risk of postural hypotension and falls.
|
|
|
如果有明显直立性低血压以及血压下降的危险时,将个体的血压控制目标升高。 |
|
Revise parameter and adjust position without stopping the machine.
|
|
|
生产过程中无需停机即可实时修改参数、调整位置。 |
|
Revise to the question in the structural design and adjustment , confirm the final structure file .
|
|
|
对结构设计中的问题进行修改和调整,确定最终的结构文件。 |