|
Preparing documents to support the shop floor production. This may include but not limited to documents like Job Instruction Sheet, Operation Instruction, Production Routings, Quality Checking Inspections and CNC program. |
中文意思: 提供工作指导,运作指导,生产安排,质量检验及CNC程序等相应文件以支持车间生产。 |
以下为相关句子列表(点击查看,可以看对应的解释):
|
|
Prepares to accompany, the printing lyrics, and will accompany induct record the software.
|
|
|
3准备伴奏,打印歌词,并将伴奏导入录音软件。 |
|
Prepare、monitor and control maintenance budget.
|
|
|
准备、监督并控制维修成本。 |
|
Preparing a weekly or bi-weekly note that says what you did, where you are, and what you intend for the next period is a useful prod; it also helps to answer the advisor's question of whether you're doing anything at all.
|
|
|
准备每周一次或每周两次记录下面的东西:你正在做什么,你已做到哪里,下一阶段你准备解决的重点问题;这样也可帮助回答导师的问题:你是否完成了某件事情。 |
|
Preparing and delivering work packages (drawings, calculations, specifications, bills of materials, material requisitions, etc.). Conformance to contract for all engineering and material. Monitoring man-hour and material estimates and reporting changes.
|
|
|
准备并交付工作(图纸,计算,规范,材料的费用,材料的要求,等).满足合同所有工程及材料要求.监审人工和材料测算并报告变化. |
|
Preparing bank reconciliation reports and cash reports.
|
|
|
编制银行余额调节表,出具现金报告。 |
|
Preparing documents to support the shop floor production. This may include but not limited to documents like Job Instruction Sheet, Operation Instruction, Production Routings, Quality Checking Inspections and CNC program.
|
|
|
提供工作指导,运作指导,生产安排,质量检验及CNC程序等相应文件以支持车间生产。 |
|
Preparing for the Christmas Eve feast makes me at my wit's end.
|
|
|
筹办圣诞宴会简直使我智穷才竭。 |
|
Preparing market research report, project evaluation, feasibility study, contract, articles of association, agreement and other lated documents.
|
|
|
为投资人在中,新,马投资作前期市场调研,项目评估,提供投资方案、草拟可行性研究报告、合同、章程、协议等文件。 |
|
Preparing the Manufacturing Operation Plans for generator casing, rotors assembly, stator bars and laminations producing in accordance with engineering documents and master planning schedule in order that our production has the reasonable costs and effici
|
|
|
根据工程设计文件和主计划按时为定子机座、转子下线、定子线棒和冲片的制造等编制工艺过程卡,使产品制造成本和加工效率合理,产品质量达到设计要求。 |
|
Preparing work of a meeting of Preparatory Committee for International Trade Conference which will be hold on October is under way now.
|
|
|
在十月份召开国际贸易会议筹备委员会会议的准备工作正在进行。 |
|
Preparing, submitting and maintenance of product certificates from SFDA, CMC etc for products sold in China.
|
|
|
准备,递送和维护SFDA,CMC等发放的在中国销售的产品证书. |
|
|
|