|
The Project Content : 1st, aquatic world amusement park. 2nd, byland out drink, tea house, entertainment and leisure zone. 3rd, three single lands fruit leisure zone; 4th, the show zone for the handcraft paper-making. |
中文意思: 项目内容:1、水上世界游乐园;2、半岛外饮、茶园、娱乐、休闲区;3、三个孤岛果园休闲区;4、手工造纸操作表演区。 |
以下为相关句子列表(点击查看,可以看对应的解释):
|
|
The Professor: Why did you ask the boss for cab fare? Mr. Potato Head canwithdrawl money fromthe bank whenever he likes.
|
|
|
老夫子:你向人家要车钱干么?他上银行随便去取就行了。 |
|
The Program Manager is your advocate at NASA HQ and must be tied into the decision makers and should aid your efforts to be tied in also.
|
|
|
他在NASA总部是你的支持者,他必须成为决策者之一,他会帮助你,让决策层意识到你的努力。 |
|
The Program in Women's Studies offered 22 subjects during the academic year 2002-2003, with approximately 300 students enrolled.
|
|
|
女性研究的课程在2002-2003学年之间提供了22门课程,大约有三百名学生参与。 |
|
The Program includes a short trip to Vienna (the capital of Austria), a visit to the “Asia Center” in Budapest, up to 4 visits to companies in Budapest, a visit to the Chamber of Commerce in Budapest, and to International Trade Development Office for Hung
|
|
|
暑期班包括了一系列的商务课程及参观,其中同学们将会到瓦西广场、布达佩斯的商会大楼、匈牙利国际贸易发展局及另外四间著名的公司,行程中亦包括到维也纳(奥地利首都)的观光。 |
|
The Programmable Logic Controller (PLC) is dealt with in terms of application of engineering and the practice in the Sampling Control System of coal conveyer.
|
|
|
摘要从工程应用的角度,简述了可编程序控制器(PLC)在实际的输煤采样控制系统中的具体应用。 |
|
The Project Content : 1st, aquatic world amusement park. 2nd, byland out drink, tea house, entertainment and leisure zone. 3rd, three single lands fruit leisure zone; 4th, the show zone for the handcraft paper-making.
|
|
|
项目内容:1、水上世界游乐园;2、半岛外饮、茶园、娱乐、休闲区;3、三个孤岛果园休闲区;4、手工造纸操作表演区。 |
|
The Project Content : Basing on the existing workshop foundation, expand three FD vacuum drying production lines, which was reserved before and totally increase the awning area for 600 square meters.
|
|
|
项目内容:在现有厂房的基础上,扩建预留的三条FD真空干燥生产线共计增加棚面积600平方米。 |
|
The Project Content : Construct first production line for period 102 thousand tons per year; the consequence will be started when the surrounding bamboo source develops in scale to guanrentee the enough material for the second stage construction.
|
|
|
项目内容:建设首期10.2万吨/年漂白竹浆生产线;待项目建设及周边竹材资源有更大发展时,能保证第二期项目建设原料之需时,建设第二期项目。 |
|
The Project Content : Construct the Yuanbaoshu plant base 100,000 mu, the scientific research base, offices and workshops 200 mu in the Emei city; and produce flavanone 200 tons, chlorogenic acid 0.75 ton, tannin 400 tons, silver piece oil 8,000 tons, sil
|
|
|
项目内容:在峨眉山市建设元宝树种植基地10万亩,科研基地、办公用房、生产车间等占地200亩;年产黄酮200吨,绿原酸0.75吨,单宁400吨,元宝油8000吨,元宝茶500吨,保健饮料1.25万吨。 |
|
The Project Content : Constructing the standard producing workshop for the Chinese traditional and herbal medicine drink and pills.
|
|
|
项目内容:建设标准化的中药饮片车间,进行饮片加工. |
|
The Project Content : In 2006, the company will have the annual synthesis productivity of 1 million tons iron, 1 million tons steel, 950,000 tons raw material, 500,000 tons coke and 2.5 million tons board Band Steel that is the extending of the downriver
|
|
|
项目内容:该公司2006年将形成年产铁100万吨、钢100万吨、材95万吨、焦50万吨以上的综合生产能力,250万吨板带钢项目是下游产业链的延伸,符合国家钢铁产业发展政策。 |
|
|
|