您现在的位置:生物医药大词典 >> 英汉双语句子大全 >> 的意思
Main point: When butterfly circle, along with proper order small “Yu Ji” root of palm , big “Yu Ji” and four fingers with slow and sort strength.
中文意思:
要领:蝶转时,着力点依小鱼际,掌根,大鱼际,四指端的顺序周旋,要缓慢,柔和。


以下为相关句子列表(点击查看,可以看对应的解释):
Main point: Speed slowly and softly not quick like flying. 要领:速度要缓慢,要柔和,不要像飞一样。
Main point: The operation. should perform from light to heavy without strong force and use osmotic strength gradually into the internal. 要领:要用逐渐向内渗透的力,由轻到重来操作,不许用暴力。
Main point: The rolling must be sucked without floating; surmount knee joint conveniently with smooth and evasive without hard-going. 要领:滚法要吸定,不要发漂,在膝关节处要顺势越过,不要发涩,要圆滑流畅。
Main point: The strength should be well-distributed and gentle, The frequency should be moderate, Holding and rubbing on joint of knees boing over two palms should be stopped on the knee with rubbing repeatedly for 5-10 seconds which main point is well-di 要领:用力要均匀,柔和,频率要适中,抱揉膝关节,在上述动作完毕后,顺势用两手抱住其膝关节处,用揉按法反复操作约五至十秒,其要领:均匀,和缓。
Main point: The technique should be soft ,but should be permeated, more stronger pressing on transverse colon and light pressing on descending colon. 要领:手法要柔和,但还要渗透,横结肠压力宜重点,降结肠压力要轻。
Main point: When butterfly circle, along with proper order small “Yu Ji” root of palm , big “Yu Ji” and four fingers with slow and sort strength. 要领:蝶转时,着力点依小鱼际,掌根,大鱼际,四指端的顺序周旋,要缓慢,柔和。
Main point: When operating, skill action should be spreaded out with arc, tighten up the belly, harbour chest and action should be consistent. 要领:操作时,技术动作呈弧形动作展开,要收腹含胸,动作连贯。
Main press-cut roller adopt universal shaft driving, which is advanced in designing. 主要压切辊采用万向轴传动,传动设计先进。
Main press-cut rollers adopt universal shaft driving . The driving is fast and it can guarantee the knives' service life. 主要压切辊均采用万向联轴器传动,传动轻快,刀具寿命保证。
Main press-cut rollers adopt universal shaft driving with fast driving and lifetime guarantee of cutting tool. 主要压切辊均采用万向轴传动,传动轻快,刀具寿命保证。
Main problems are ① the anti-slide test report and inspection record of high strength bolts that connecting structure steels have not been provided according to the requirement of design; ② Since there is no measurement certificate attached to the test re 主要是①未按设计要求提供出钢架连接处高强度螺栓抗滑移系数试验报告和检测纪录;②由山西省煤炭工业管理局晋城矿区工程质量检测站出具的试验报告无计量认证章,在今后的工程中不能再作为单位工程质量控制资料中的试验报告。
 
你知道它的英文吗?
你知道中文意思吗?
热门分类


成为编辑 - 词典APP下载 - 关于 - 推荐 - 手机词典 - 隐私 - 版权 -链接 - 联系 - 帮助
©2008-至今 生物医药大词典- 自2008年3月1日开始服务 生物谷www.bioon.com团队研发
沪ICP备14018916号-1