|
Completed SanHe(in Jiangsu) extrordinarily huge bridgeTrigid structure engineering consultation,I was the consulting and management engineer and the associate director of supervisory group. |
中文意思: 92年完成江苏三河特大桥T型钢结构工程监理,任监理工程师及监理付组长。 |
以下为相关句子列表(点击查看,可以看对应的解释):
|
|
Complete two missions as a Polish soldier.
|
|
|
完成比利时的两个任务! |
|
Complete two missions as an American soldier.
|
|
|
完成美国两个任务! |
|
Complete urinary obstruction can develop into a life-threatening emergency with 48 hours.
|
|
|
完全的泌尿道阻塞,在48小时内会威胁生命。 |
|
Complete with dancing, singing, instrument playing, and even a short musical theater performance about “Leehom's Dream World”, this concert is sure to be fun and fresh!
|
|
|
它将结合舞蹈、歌唱、乐器演奏、甚至还有一段简短关于「力宏的梦想世界」的歌舞剧表演,相信这场演唱会一定会十分有趣新鲜! |
|
Complete your application in ink.
|
|
|
用钢笔填申请表. |
|
Completed SanHe(in Jiangsu) extrordinarily huge bridgeTrigid structure engineering consultation,I was the consulting and management engineer and the associate director of supervisory group.
|
|
|
92年完成江苏三河特大桥T型钢结构工程监理,任监理工程师及监理付组长。 |
|
Completed SongTiao(in Lianyungang city) grade seperation bridge's mutual transportation,continuous box-beam engineering consultation;I was the representative of consulting engineers.
|
|
|
93-94年完成连云港宋跳立交桥全互通、连续担任工程监理,任总监代表。 |
|
Completed projects must be submitted by 10 March.
|
|
|
已经完成的项目必须在3月10号之前递交. |
|
Completed setup a company needs 1.5 months.
|
|
|
成立公司合计需要1.5个月时间。 |
|
Completed the feasible report of Xuzhou Zhengji River hydraulic project and equipment venewal of Jiangsu 2nd pumping station ,and inspected the draft deign of consolidation of Zhenjing Jianbi Sluice gate.
|
|
|
完成徐州市郑集河送工程,江都二站设备更新改造可行性报告及镇压江谏壁节制闸除险加固工程初设的审查。 |
|
Completed the project,spot check in the contract,If not in the light of provid medicines gived.We assume the consequence.
|
|
|
四、工程完工,在本合同工程范围内随意抽查,如防蚁药剂没按规定的配比进行施药,我公司承担由此引起的所有后果。 |
|
|
|