|
1045 BILL OF QUANTITIES: The tenderer's attention is drawn to the fact that the tender is a Fixed Lump Sum Tender and that no adjustment will be made to the Bill of Quantities for inaccuracies or discrepancies. |
中文意思: 工程量清单:投标人应注意此标为固定标的额、一次付清式投标,如清单中有任何不准确或矛盾之处,均不会对标的额做任何调整。 |
以下为相关句子列表(点击查看,可以看对应的解释):
|
|
|