|
Open test cock No. 4 and flush test cocks Nos. 1, 2 and 3 on reduced pressure assembly then close test cock No. 4.
|
|
|
开启测试旋塞4号,冲洗减压总成上的测试旋塞1号,2号和3号,然后关闭测试旋塞4号。 |
|
Open the Active Directory Users And Computers console.
|
|
|
打开活动目录用户和计算机控制台。 |
|
Open the Frames and Preview windows.
|
|
|
打开帧和预览视窗。 |
|
Open the Group Policy object where Folder Redirection policy is set.
|
|
|
打开设置文件夹重定向策略的组策略对象。 |
|
Open the Layer Properties and change the Color Overlay.
|
|
|
打开层属性设置界面,更改叠加颜色。 |
|
Open the Luma Server rollout in Brazil r/s and under Direct Illumination, enable the Skylight option.
|
|
|
打开巴西的照明设置卷展栏,在直接照明栏中,激活天光选项。 |
|
Open the Preferences in Mac?
|
|
|
开着的在雨衣的偏爱? |
|
Open the Properties for the Printers virtual folder and click the Documents tab.
|
|
|
打开打印机虚拟目录的属性,点击文档选项卡。 |
|
Open the Solar Plexus chakra.
|
|
|
打开太阳丛脉轮。 |
|
Open the air hole; the fire is dying down.
|
|
|
把气孔打开,火要熄了。 |
|
Open the air-release valve of the trap beforework to discharge a large quantity of non-frozen gas.Then drivetightly the air-release valve and preheat gradually.The preheatrate should not be more than 36℃/minutes.
|
|
|
疏水阀在工作前需打开放气阀,使不凝结气体大量排出,然后拧紧放气阀,并逐渐预热,预热率不超过36℃/8分钟。 |