|
Check again for errors and rewrite.
|
|
|
再次检查错误和写一次。 |
|
Check all items in the checklist, such as test of content of oxygen, test of explosion point, exploded-proof lamp, good ventilation.
|
|
|
核对检查单并检查所有项目,如测量氧气含量,检验爆炸点,防爆灯和通风。 |
|
Check all of the adjacent squares.
|
|
|
测试所有的相邻方块。 |
|
Check all table settings, seating, cloths for alignment and cleanliness.
|
|
|
检查所有餐桌的摆设,是否清洁,整齐。 |
|
Check all valves to ensure that they are in correct states. Open the high salinity water drain valve on the RO device.
|
|
|
检查所有阀门,以确定阀门处于正确状态。将RO设备上浓水排放阀打开。 |
|
Check and adjust radial angular and axial misalignment both ends of coupling .
|
|
|
检查并调整机组的径向、角向及周向不对中至机组安装调试标准值。 |
|
Check and analyze records by preparing summaries and statistics for MDR's and all QC inspection results.
|
|
|
根据物料差异报告和质量报告/记录对质量问题进行检查和分析。 |
|
Check and approve by China's Securities Regulatory Commission Limited Company , aviation of Shanghai , issue 200 millionA skein to the public on will it be September 16 2002.
|
|
|
经中国证监会核准上海航空股份有限公司将于2002年9月16日向社会公众发行2亿A股。 |
|
Check and ensure that the soldering machine and tools are working order, reliable and in good working order before starting.
|
|
|
焊接工作开始前,首先检查焊机和工具是否完好和安全可靠。 |
|
Check and ensure the soldering machine and tools are in good condition and safe before starting to jointing.
|
|
|
焊接工作开始前,首先检查焊机和工具是否完好和安全可靠。 |
|
Check and improve the electrical &pneumatic assembly work at jobsite.
|
|
|
在工地,检查和完善电气元件的安装。 |