|
The Construction Term : The Shawan is 618 square kilometers, mountainous area accounts for 68.2%, the knoll area accounts for 17%, massive mountainous areas are in elevation 800 - 2,000 meters. |
中文意思: 建设条件:沙湾区幅员面积618平方公里,其中山区面积占68.2%,丘陵面积占17%,大量山区面积在海拔800-2000米。 |
以下为相关句子列表(点击查看,可以看对应的解释):
|
|
The Constitution of the Republic of China goes into effect.
|
|
|
1947年的今天,“中华人民共和国宪法”正式生效。 |
|
The Constitution stipulate that women shall have equal rights with men in voting and being elected.
|
|
|
宪法规定妇女和男子一样,有同等的选举权和被选举权。 |
|
The Constitution stipulate that women shall have equal rights with men in voting and being elected.
|
|
|
宪法规定妇女和男子一样,有同等的先举权和被先举权。 |
|
The Constitutional Monarchy of Hunzland is a tiny, safe nation, renowned for its strong anti-business politics.
|
|
|
杭国(君主立宪制),是个安全的小国家(?),以强烈的反商(资本主义)政策而闻名。 |
|
The Construction Bank has 100,000 RMB put out at 5 percent for the house.
|
|
|
建设银行以5%利息放贷10万人民币用于购房。 |
|
The Construction Term : The Shawan is 618 square kilometers, mountainous area accounts for 68.2%, the knoll area accounts for 17%, massive mountainous areas are in elevation 800 - 2,000 meters.
|
|
|
建设条件:沙湾区幅员面积618平方公里,其中山区面积占68.2%,丘陵面积占17%,大量山区面积在海拔800-2000米。 |
|
The Construction Term : The project is 160 kilometers away from Leshan, locating between the Mt. Emei and Bamboo Sea in the South of Sichuan.
|
|
|
建设条件:项目地址乐山160公里,位于乐山、峨眉与蜀南竹海川西环线中点。 |
|
The Construction Term : The project is located in Emei City, is 110 kilometers away from the airport, 2 kilometers away from the train station, 20 kilometers away from highway; the mobile communication, telecom, network cover all over the project; Gas, el
|
|
|
建设条件:建设地峨眉山市,距机场110公里,距火车站2公里,距高速公路20公里;移动、电信、宽带网络覆盖;水电气可满足;项目技术有保障。 |
|
The Construction Term : The project is located in Emei City, it is 120 kilometers away from the airport, 8 kilometers away from the train station, 25 kilometers away from highway, the mobile communication, telecom, network cover all over the project;Gas,
|
|
|
建设条件:建设地峨眉山市,距机场120公里,距火车站8公里,距高速公路25公里;移动、电信、宽带网络覆盖;水电气可满足;项目技术有保障。 |
|
The Construction Term : The project is near the city, besides the National Road 305. The Water, electricity and the gas are available.
|
|
|
建设条件:紧临城区,在305国道旁,用水、用电、用气可满足。 |
|
The Construction Term : The project locating in Muchuan is 98 kilometers away from Leshan, so the transportation is vastitude with the cement national highway 213.
|
|
|
建设条件:建设地沐川县沐溪镇,交通便利,国道213线水泥路面,距乐山98公里;固定电话、移动电话畅通;能满足生产用水电气。 |
|
|
|