|
P&ON also posted disappointing growth, with liftings up just over 5% to 3.7 million teu.
|
|
|
ON在增长率方面仍旧没有大的起色,只增长了5%多一点,达到370万标准箱。 |
|
P&S: potable water system in public area, rain, surface runoff, waste water should be discharged in separation.
|
|
|
给排水:公共部分饮用水系统,雨、污、废水分流排放。 |
|
P) Autopilot in altitude hold mode produces a 200 fpm descent.
|
|
|
问)自动飞行在固定高度模式令飞机每分钟自动下降200尺。 |
|
P) DME volume unbelievably loud.
|
|
|
问)DME音效声大得不可想象! |
|
P) Evidence of leak on right landing gear.
|
|
|
问)右起落架机轮有漏气迹象。 |
|
P) Friction locks cause throttle lever to stick.
|
|
|
问)推力杆锁锁定了推力位置,不能动。 |
|
P) Left inside tire almost needs replacement.
|
|
|
问)左内机轮快要更换了。 |
|
P) Number two engine missing.
|
|
|
问)二号发动机不见了。 |
|
P) Something loose in cockpit.
|
|
|
问)座舱内有些东西松了。 |
|
P) Test flight OK, except auto land very rough.
|
|
|
问)试飞成功,但自动降落不太顺畅。 |
|
P+V GmbH Pr?zisions. u. Verbindungstechnik informs you about special screws as well as about Special parts.
|
|
|
特种车销件、特殊部件和特殊部件是我们文件中的一部分,请您电话垂询更多信息。 |