|
The method has been successfully applied in the quality control of enamel-insulated wire production.
|
|
|
该方法已成功地应用于漆包线生产过程质量监控。 |
|
The method has it roots in a branch of mathematics called conformal mapping.
|
|
|
该方法的数学分支,它植根于所谓形映射. |
|
The method has the advantage of clear thinking, rapidly converging and high precision.
|
|
|
这种方法求解思路清晰,收敛速度快,计算精度高。 |
|
The method has the characteristics such as high speed and precision as well as available sequential results.
|
|
|
指出该方法具有速度快、探测精度高、可获得连续结果等特点。 |
|
The method improves the precision of the precipitation isoline and is important to count the surface precipitation of the drainage area.
|
|
|
结果表明该方法提高了绘制等雨量线的质量,对于计算流域的面雨量具有重要实际意义。 |
|
The method in question is a ciphertext-only attack. This means that we don't need bits of guessed/known plaintext for a successful decryption.
|
|
|
解决问题的方法是对纯密码信息进行攻击。这意味着我们不需要猜解或在已知明码文本的某些比特位信息的情况下来对密文进行完美解密。 |
|
The method in this paper will supply an algorithm gist and a reference for the signal processing in the detection of underground target.
|
|
|
所述的算法分析、小波基的选择及小波变换阶的选择等,为地下目标探测中的信号处理,提供了算法依据和应用方法参考。 |
|
The method in which the whole solution and the local solution is contrasted is applied to deduce the stress intensity factor solution for the model Ⅰ crack of the orthotropic materials, and then the influence of the materials on the stress intensity is in
|
|
|
摘要利用对比全场解和局部解的方法,得出了正交异性材料Ⅰ型裂纹的应力强度因子表达式,并将材料常数对其的影响做了简单的探讨。 |
|
The method integrates everyone's preference into all decision-makers' preference and realizes multiple decision-maker and multiple objectsive decision, exerting everyone's opinions completely.
|
|
|
该方法在充分发挥各个决策者见解的基础上,将个人的偏好集结成群体的偏好,实现灌溉方案的多人多目标决策。 |
|
The method is also proposed on making thread-hole and bolt in interving concerted process, bolt connection as well.
|
|
|
干涉配合螺接过程中螺孔和螺栓的加工方法以及螺栓的安装方法。 |
|
The method is applied to Shenzhen Pumped Storage Power Plant, the regression coefficients corresponding to the in-situ stress factors are determined by fitting the stress measured values, and the initial stress field is obtained for the rock mass of whole
|
|
|
并以深圳抽水蓄能电站为实例,通过拟合实测地应力资料获得对应于地应力构成因素的回归系数,并得到整个工程区的岩体初始应力场。 |