您现在的位置:生物医药大词典 >> 英汉双语句子大全 >> 的意思
Requirements :35 to 45 years old, bachelor degree or above ,major in garden, environmental art, or landscape architecture, more than 12 years experience in construction and organization management of large scale garden or landscape engineering projects, h
中文意思:
园林、环境艺术、景观建筑专业本科以上学历,12年以上大型园林景观工程施工组织管理经历,并亲自全程组织管理过多个著名园林工程项目。


以下为相关句子列表(点击查看,可以看对应的解释):
Requirement: Age from 25 to 35, good—looking, above 1 years of interrelated working experience, strong responsibility, At least bachelor's degree in finance needed. 要求:25~35岁之间;财会专业本科以上学历;一年以上相关工作经验;责任心强。
Requirement: Air inlet must start to open when down stream pressure is 1.0 PSI or above. 要求:当下游流体压力在1.0PSI及以上时,空气进口必须开始打开。
Requirement: Below 30 years old. Above senior high school degree. Think smartness and in good condition, retired soldier will be advantage. 要求:30岁以下,高中以上学历,身体健康,思维敏捷。武警退役、复员军人及警校毕业生优先。
Requirement: Supply pressure drop must be 1.0 PSID or more when water flow stops from test cock No. 2. 要求:当水流从测试旋塞2号上停止时,供应压降必须在1.0PSID及以上。
Requirement:Bachelor degree in mechanics, minimum 3-year relevant working experience, with qualification of quality system auditor, fluent English in oral. 要求:本科学历,机械专业;3年以上相关职位工作经历,具有质量体系审核员资质和流利的英语口语沟通能力。
Requirements :35 to 45 years old, bachelor degree or above ,major in garden, environmental art, or landscape architecture, more than 12 years experience in construction and organization management of large scale garden or landscape engineering projects, h 园林、环境艺术、景观建筑专业本科以上学历,12年以上大型园林景观工程施工组织管理经历,并亲自全程组织管理过多个著名园林工程项目。
Requirements :35 to 45 years old, bachelor degree or above,major in civil construction or architectural management, more than 10 years experience in supervising construction engineering, having participated as a chief supervisor in a number of famous proj 工民建、建筑管理专业本科以上学历,10年以上建筑工程监理工作经历,并亲自全程监理管理过多个著名工程项目。
Requirements are highlighted with bold underlined letters. 需求被用粗体下划线突出出来。
Requirements are well documented. + Evidence shows WI being used to document CA. 作业要求有档证明.+有证据显示作业指导书用作纪录改善行动.
Requirements elicitation (RE) is the base building block for a software project and has very high impact on subsequent design and build phases as well. 需求捕获是软件项目的基础部分,对后继的分析设计及开发实施有重大影响。
Requirements engineering consists of activities like requirements elicitation, specification and validation. 需求工程包括的活动有需求捕获,需求定义和需求验证。
 
你知道它的英文吗?
你知道中文意思吗?
热门分类


成为编辑 - 词典APP下载 - 关于 - 推荐 - 手机词典 - 隐私 - 版权 -链接 - 联系 - 帮助
©2008-至今 生物医药大词典- 自2008年3月1日开始服务 生物谷www.bioon.com团队研发
沪ICP备14018916号-1