|
Request reason not starting engines.
|
|
|
请问不开车原因。 |
|
Request the permission(clearance) to line-up and take-off.
|
|
|
请求允许(许可)进跑道起飞。 |
|
Request to enter the runway.
|
|
|
请求进跑道。 |
|
Request to fly over your field at 400m, we will have a check on the system.
|
|
|
请求高度400米飞越机场,我们将进行检查这一套系统。 |
|
Request to make a visual approach for R/W31.
|
|
|
请求向31号跑道做目视进近。 |
|
Request upper wind at altitude 600m.
|
|
|
请求600米高空风。 |
|
Request upper wind at dumping altitude.
|
|
|
请告诉放油高度上的高空风。 |
|
Request winds aloft (upper winds) between Guangzhou and Kun Ming FL210.
|
|
|
请求广州至昆明之间飞行高度层210的高空风。 |
|
Request(What's) the type of aircraft.
|
|
|
请问你的机型。 |
|
Requested CA reply due date is specified in most cases. Systematic follow up and manufacturers can respond to correct the root courses per request.
|
|
|
要求改善行动回复日期有清楚注明,系统化跟进,并于大部份情况下能如期回复. |
|
Requested by the Local Taxation Bureau, we'll calculate the tax for the benefits and deduct the tax from the salary from August 2007.
|
|
|
按照税务局的要求,公司从2007年8月起对员工福利进行计税并从工资中代扣。 |