|
Step 3: Review the scan results and click REPAIR. You are finished!
|
|
|
第三步:看看扫描结果再点击REPAIR,完成! |
|
Step 3: Then, adjust the eye-shape as desired.
|
|
|
再把眼形线调较到理想形状。 |
|
Step 4. Click Have Disk...button.
|
|
|
第四步:单击’从磁盘安装’. |
|
Step 4: Achieve your goals through active leadership and motivation.
|
|
|
第四步:以积极的领导和激励来达成您的目标. |
|
Step 4: Click the button again in Step 2.
|
|
|
步骤四:再点击步骤二的那立按钮。 |
|
Step 5. Insert Installation diskette into the right drive.(e.g.A:\) Then click the Browse...button.
|
|
|
第五步:将产品的配套驱动磁盘插入驱动器A,单击’浏览’按钮. |
|
Step 5: Enter your Marketing Editor (ME) serial number on screen if relevant.
|
|
|
如果有就在屏幕上输入你的ME序列号。 |
|
Step 5:? First remove the hubcap or wheel cover.? The lug wrench often has a flat end which you can use to pry off the cover.? If not, a screwdriver will work just fine.
|
|
|
第四步:通常有指示印对杰克或某处存放舱.阅读这些指示,他们会告诉你哪里杰克车辆和任何特殊步骤,你将需要采取的措施. |
|
Step 5:Input other structural parameters of frame and define the position of the nose pad and bridge, and select the type of lug.
|
|
|
再填上镜框结构数据,设定叶子及鼻梁位置等。同时,选择庄头形状。 |
|
Step 5:Task 3: Discussion: What should we eat?
|
|
|
了解我们需要多吃或少吃什么? |
|
Step 6: After complete the grouting and curing work between all the installation work in the liner (including process piping, pipe support, etc.) &liner and rock bed, complete the installation work of top elliptic head of liner using 35/50 ton hyd-crane a
|
|
|
第六步:待衬管内所有的安装工作(包括工艺配管、管道支架等)及衬管与岩床间的灌浆、养护工作完成后,用35/50吨液压起重机和25吨汽车起重机完成衬管顶部封头的安装工作。 |