|
This paper presents the principle and the maximum resolution of the spectral imaging followed by taking a case study as an example to discuss the application of this technique to sedimentary facies classification and the practical significance of it in pr
|
|
|
从理论基础分析出发,首先介绍了频谱成像的原理、最大分辨率,然后结合国内某油田的实际情况,阐述用频谱成像技术进行沉积相划分以及判断沉积环境水进水退的方法及实际效果。 |
|
This paper presents the principles of SWMM model, which consists mainly of three parts, i.e. ground surface rainfall sub-system calculation, overland flow sub-system calculation and storm-sewer flow sub-system calculation.
|
|
|
摘要介绍了SWMM模型原理,包括地表产流子系统演算、地表汇流子系统演算和传输子系统流量演算。 |
|
This paper presents the principles of various techniques to construct the image of defects in concrete structures using the elastic wave test.
|
|
|
表面讯号经过适当处理后,便可显现缺陷之位置或尺寸。 |
|
This paper presents the process of comparison and selection of bridge type alternatives for two-pylon cable-stayed bridge with main span longer than 1000m for Sutong Bridge at its preliminary design stage, and describes in details the reasons for recommen
|
|
|
摘要介绍了苏通大桥初步设计阶段针对千米级双塔斜拉桥桥型方案的比选情况,阐述了把七跨连续钢箱梁斜拉桥做为最终推荐方案的理由。 |
|
This paper presents the selection of vibratory hammer types for construction of the pile foundations of Dashengguan Changjiang River Bridge in Nanjing and the problems and solutions to the problems encountered in application of Model APE400B tandem vibrat
|
|
|
摘要介绍南京大胜关长江大桥桩基施工作业中振动锤的选型,及APE400B型并联振动锤在南京大胜关长江大桥施工中碰到的问题、解决的方法。 |
|
This paper presents the structure of the scaffold, as well as setting precamber and decentering techniques.
|
|
|
对该支撑拱架的结构、预留拱度设置、拱架卸落等进行了介绍。 |
|
This paper presents the study of the reasonable personnel structure of the library from education, profession, professional title, age, sex and language and suggests the principle and the scale of configuration.
|
|
|
摘要本文分别从学历、专业、职称、年龄、性别、语种和岗位7个方面,对图书馆人员结构的合理性进行了研究,提出了各种结构的具体配置比例或配置原则。 |
|
This paper presents the study on assembly method, material and structure of the dielectric for improving the heat dissipating performance of slow-wave structures of the helix TWT.
|
|
|
摘要综合叙述了目前人们为提高螺旋线行波管慢波组件的散热性能而在装配方法、组件材料以及夹持杆的结构这三方面所进行的研究。 |
|
This paper presents the test approach to the complex wake wind tunnel, including (1) basic principles of the test; (2) design method and parameters of rotor and warship models; (3) installation scheme and test conditions of the model; (4) some test result
|
|
|
介绍了复合流场的风洞试验方法,包括试验的基本原则、旋翼及舰船模型的设计方法和参数、模型的安装方案及试验状态,并给出了部分试验结果及其分析。 |
|
This paper presents the train of thought and method of Laolonghu waterway regulation, and mainly expounds the design of the curve's cutting-off engineering and widening engineering of the principal part of work.
|
|
|
文章简要介绍了劳龙虎水道的整治思路和方法,并着重介绍其主体工程裁弯拓宽工程的设计情况。 |
|
This paper presents the trajectory planning of five-bar hybrid driven mechanism based on inverse kinematic theory and spline interpolation function, analyses the effect of rotational speed of real time non-adjustable motor on the acceleration of the manip
|
|
|
摘要运用逆运动学原理和样条函数给出了混合驱动五杆机构的轨迹规划方法,并讨论了常速电机的转速末端执行器和伺服电机加速度的影响,得出了他们之间的数学关系式。 |