|
0 No program at all or informal review on quality data. |
中文意思: 没有此类专案或只对有关品质资料进行非正式的检讨. |
以下为相关句子列表(点击查看,可以看对应的解释):
|
|
0 No follow up on customer design version, usually focus on the date of receiving. Internally issued documents (e.g. work order, BOM) cannot be traced to relevant design version.
|
|
|
没有跟进客户的设计版本,通常只注重接收日期内部档(如:工作指令单,BOM),未能追溯到相关设计版本. |
|
0 No instruction or instructions such as sampling level (AQL) and acceptance criteria are not well defined.
|
|
|
没有指引或指引没有明确定义,如抽样水准(AQL)及接收标准. |
|
0 No measurement and control of calibration environments.
|
|
|
完全没有测量及控制校正环境. |
|
0 No monitoring and control requirement on screwing torque.
|
|
|
没有要求对对螺丝扭力进行监测及控制. |
|
0 No monitoring and control requirement on solder iron temperature.
|
|
|
对烙铁温度没有要求监测及控制. |
|
0 No program at all or informal review on quality data.
|
|
|
没有此类专案或只对有关品质资料进行非正式的检讨. |
|
0 No program or informal activities performed.
|
|
|
没有此类计画或只实行非正式测试活动. |
|
0 No request or informal request for CA, such as fax or e-mail, from the manufacturer.
|
|
|
对供应商改善行动没有要求或非正式要求,例如以传真或电子邮件方式执行. |
|
0 No special documented guidelines for in-process control, random checking.
|
|
|
没有档指引对制程的控制,只作随机性的抽检. |
|
0 No special requirement, direct hand written amendment in place.
|
|
|
没有特别要求,在原文处(适当位置)直接手写修改. |
|
0 No storage condition/shelf life requirement set up.
|
|
|
没有制定对储存环境的要求. |
|
|
|