以下为句子列表:
英文: Abstract: An algorithm to resolve the coupling effect problem is proposed during the cross point assignment (CPA) stage.In the algorithm,the priority queue concept and the rip-up and reroute strategy are combined to control crosstalk noise caused by inter
中文: 文摘:提出了一种在过点分配阶段解决噪声耦合效应问题的算法.该算法采用优先队列同拆线重布策略相结合的方法,控制由互连线耦合电容引起的串扰噪声.算法中,首先按照线长和约束限制,将线网划分到若干个优先队列中.然后,将每个优先队列的过点分配问题转换为线性分配问题.在完成一个线网队列的分配后,通过过点分配后处理过程检查串扰约束满足情况,对违反约束的线网对进行拆除,放入后续线网队列进行重新分配.实验数据表明,该算法能够取得好的效果.
更详细...
英文: After the Ling Canal connected Yangtze River and the Pearl River, Wuzhou became the cross point of Land / Oacean Silk Road.
中文: 汉高后五年(公元前183年),赵佗称南越武帝,封赵光为苍梧王,建苍梧王城。
更详细...
英文: An algorithm to resolve the coupling effect problem is proposed during the cross point assignment (CPA) stage.In the algorithm,the priority queue concept and the rip-up and reroute strategy are combined to control crosstalk noise caused by interconnect co
中文: 提出了一种在过点分配阶段解决噪声耦合效应问题的算法.该算法采用优先队列同拆线重布策略相结合的方法,控制由互连线耦合电容引起的串扰噪声.算法中,首先按照线长和约束限制,将线网划分到若干个优先队列中.然后,将每个优先队列的过点分配问题转换为线性分配问题.在完成一个线网队列的分配后,通过过点分配后处理过程检查串扰约束满足情况,对违反约束的线网对进行拆除,放入后续线网队列进行重新分配.实验数据表明,该算法能够取得好的效果.
更详细...
|