以下为句子列表:
英文: According to the existing equipment status on Jiafeng station of Houma-Yueshan line and its connected Sihe loading point, as well as the added loading capacity required for the sihe loading point, the essay puts forward the reconstruction plan of Sihe loa
中文: 摘要依据侯月线嘉峰站及与其接轨的寺河装车点心的既有设备概况和寺河装车点需要增加的装车能力,提出了寺河装车点与嘉峰站的改造方案,并对改造前后的效益作了定性、定量的分析。
更详细...
英文: The Group owns the domestically advanced FA-series mule frames and actively renovates its existing equipment as well.
中文: 该集团拥有国内先进的FA系列细纱机,并积极对原有设备进行更新改造,年生产量达70万吨。
更详细...
|