|
Level of construction completion based on the construction control program are used to guide construction, this will be optimum construction state and optimum completion state of long span continuous rigid frame bridges. |
中文意思: 结论利用提出的基于最优施工完成度的施工控制方案来指导施工,会使连续刚构桥的施工由最优节段施工状态最终达到最优成桥状态。 |
以下为相关句子列表(点击查看,可以看对应的解释):
|
|
|