以下为句子列表:
英文: The Architect and/or Employer has the right to insist the Sub-Contractor to change the method of working or construction in circumstances that are deemed necessary and the Sub-Contractor will not be entitled to any extension of time or to any monetary com
中文: 若确有必要,建筑师和(或)雇主有权要求分包商改变其工作或施工方法;在此种情况下,分包商无权要求延长工期或获得经济上的补偿。
更详细...
英文: There is no other extension of time or any claim that time is at large except insofar all known additional tasks as stated in contract singed on 2007-1-1.
中文: 汉译英(试译):2007年1月1日签定的合同已考虑到已知的附加任务,你方不能再对此提出工期延长申诉。
更详细...
|